Ponceau
Type of resources
Topics
Keywords
Contact for the resource
Provided by
Formats
Representation types
Update frequencies
status
-
Linear location of drainage pipes under the responsibility of the Ministry of Transport and Sustainable Mobility (MTMD). Inventory item of a transverse type or pipe connecting to the ditch, whose diameter is more than 30 cm and less than 3 m.**This third party metadata element was translated using an automated translation tool (Amazon Translate).**
-
Punctual location of structures under the management of MTMD (various types of: bridge, culvert (over 4.5 meters), gantry, wall and tunnel).**This third party metadata element was translated using an automated translation tool (Amazon Translate).**
-
Following the execution of forest work, the holders must, each year, prepare and submit to the Minister a Technical and Financial Activity Report (RATF) for each of the elements of the authorized annual programming (PRANA). The technical and financial activity report includes several geometric entities allowing the verification of development works on public forest territory. Here is the list: forest roads, point infrastructure, drainage completed, drainage completed, sample plot, intervention polygons, bridge and culvert, reforested species, intervention monitoring results, intervention sector, intervention sampling unit, intervention follow-up sampling unit.**This third party metadata element was translated using an automated translation tool (Amazon Translate).**